Home >> News

Tengye performed a node inspection for an overseas descaling pump project

 

 

 

Recently, the Quality Inspection Department of Xi'an Tengye Metallurgical Engineering Co., Ltd assigned a team of technicians to conduct node inspections on an overseas descaling pump project.

 

 

According to the quality inspection process, the impeller, water outlet, water inlet, high-pressure water inlet, outer casing, pump casing, shaft, air storage tank welding parts, water storage tank welding parts, etc. are mainly inspected, and the results of the inspection parts are recorded one by one and reported in aggregate.

 

Tengye has a set of professional project process quality control procedures, in short, there are the following points:

 

I. Basis for production supervision:

1. Order contracts or technical agreements related to quality.

2. Equipment drawings, manufacturing processes, technical standards, meeting minutes, drawing modification notices and other relevant technical documents.

3. "Outline of Equipment Inspection Before Delivery".

4. "Manufacturing Process Inspection Plan".

5. "Supervision Plan".

 

 

II. Supervision content:

Qualification confirmation, document review, on-site witness, record verification, physical inspection and follow-up disposal.

 

III. Supervision Form:

Two methods are adopted: equipment in-plant supervision & routing inspection of important parts or key processes.

 

It is this meticulous attitude and super execution ability that make Tengye go further and further in the international project management. While making great strides forward, Tengye people have never forgotten their original aspirations, strictly control the quality, and are committed to providing the best products and services to the owners.